1.0.2
2020-11-05
Fixed the problem of abnormal display of the video call window;
Fixed the issue that the project creator would crash when he added himself as a task/subtask performer;
Fixed the issue that when the project creator is the executor of the task/subtask, it will crash when removed;
Optimized the problem that the display of the number of executors would be delayed after the executor of the task/subtask was removed;
Optimized the display of the project name at the top of the conversation page;
1.0.1
2020-09-28
Fixed the problem that there is no avatar in the creation task;
Fixed an error in the name of the list, and the executor list was changed to project members
Fixed the problem that the project, task/subtask, and sidebar item label categories might not be opened after clicking the sliding operation;
Fixed the problem that members of facilitator status should not be displayed in project members;
Fixed the problem that when entering a task/subtask, there is a chance that the task description cannot be edited;
Fixed the problem that when there are less than 7 login devices, the login will prompt the user to delete one device if there are too many login devices, and a blank device column will appear in the delete list, and its deletion will be stuck;
Fixed the problem that a blank page would appear when the group chat interface was displayed after the group chat was created (group members have been added);
Fixed the issue of crashing when entering Settings-Phone-"Remove Mobile Number";
Fixed the problem that you may not be able to enter the next level interface when you click "Task";
Fixed the problem that the list of members added to the task cannot be displayed in real time;
Fixed the problem that an error will be reported after entering the verification code-"Next" when registering Itask;
Optimized the loading of the first landing page (pulling the conversation list, loading friend information, configuring user information, etc.);
Optimized the mechanism of synchronous refresh task/subtask;
Optimized the synchronization refresh mechanism of the project list;
Optimized the task details, expand and collapse, add arrow to indicate Icon;
Optimized that after the task details are expanded, clicking outside the task details card will collapse the expanded task details;
Optimized the vibration effect and loading animation effect after clicking on an item in the project list;
Optimized the effect of clicking on a project in the project list to complete;
Optimized the keyboard effect of the session pop-up;
Optimized when the task/subtask list is full of one screen, add a new task/subtask, after completing the addition, the column of the newly added task/subtask should be displayed;
Optimized the prompt message that the network cannot be opened: the network connection is abnormal, please check the network;
Optimized the return function in the upper left corner of the conversation page;