UK Trains - Performance (PPM)
UK Passenger Train network
GrátisOffers In-App Purchases
6.02for iPhone, iPad and more
Age Rating
UK Trains - Performance (PPM) Capturas de tela
About UK Trains - Performance (PPM)
The public performance measure (PPM) measures the performance of individual trains advertised as passenger services against their planned timetable as agreed between the operator and Network Rail at 22:00 the night before. PPM is therefore the percentage of trains 'on time' compared to the total number of trains planned.
A train is defined as on time if it arrives at the destination within five minutes (ie 4 minutes 59 seconds or less) of the planned arrival time for London and South East or regional services, or 10 minutes (ie 9 minutes 59 seconds or less) for long distance services.
Where a train fails to run its entire planned route calling at all timetabled stations it will count as a PPM failure.
A train is defined as on time if it arrives at the destination within five minutes (ie 4 minutes 59 seconds or less) of the planned arrival time for London and South East or regional services, or 10 minutes (ie 9 minutes 59 seconds or less) for long distance services.
Where a train fails to run its entire planned route calling at all timetabled stations it will count as a PPM failure.
Show More
Novidades da Última Versão 6.02
Last updated on Sep 4, 2023
Versões Antigas
Data feed updates
Show More
Version History
6.02
Sep 4, 2023
Data feed updates
6.01
Sep 1, 2023
Updated data feed
5.02
Oct 26, 2021
Big fixes
5.01
Oct 20, 2021
Dark mode fixes
5
Oct 18, 2021
UI Updates
2.007
Jul 8, 2020
datafeed update
2.006
Feb 16, 2020
Data feed update
2.004
Dec 18, 2019
datafeed updates
2.0.03
Sep 16, 2019
Datafeed update, support fix
2.0.02
Jan 26, 2019
Minor bug fixes
2.0
Oct 13, 2018
updated user interface.
1.3.3
May 17, 2018
Minor Screen bugs fixed
1.3.1
Feb 28, 2017
New Logos
1.2.0
Sep 20, 2016
Corrected a few issues with the percentages
1.1.0
Sep 6, 2016
UK Trains - Performance (PPM) FAQ
Clique aqui para saber como baixar UK Trains - Performance (PPM) em um país ou região restrita.
Confira a lista a seguir para ver os requisitos mínimos de UK Trains - Performance (PPM).
iPhone
Requer o iOS 12.0 ou posterior.
iPad
Requer o iPadOS 12.0 ou posterior.
iPod touch
Requer o iOS 12.0 ou posterior.
UK Trains - Performance (PPM) suporta Inglês
UK Trains - Performance (PPM) contém compras no aplicativo. Verifique o plano de preços abaixo:
No Ads
R$ 9,90