OilField HandyCalc
¥1,200
1.2for iPhone, iPad and more
Age Rating
OilField HandyCalc スクリーンショット
About OilField HandyCalc
Oilfield Handy aims to ease the life of Oilfield personnel and Petroleum, Mud Engineers by providing various on-hand calculations. It is meant for Engineers involved in Oil and Gas exploration and Drilling. An essential tool out in the Oilfield, Oil & Gas Calculations. Export your Calculation Results on Email or share with colleagues. Please email us on support@saifysolutions.org, for clarifications or corrections.
Annular Volume, Pipe Volume, Hyrdostatic Pressure, ECD, Volume Conversion, Drill String Volume in bbls
Annular Volume in bbls, Strokes – Surface to Bit,Strokes – Bit to surface or “Bottoms Up”,Total Stokes – Kelly to Shaker, Slug Calculation – Length of DRY Pipe, Slug Weight Calculation – Length of DRY Pipe, Accumulator Capacity — Usable Volume Per Bottle, Control Drilling – Maximum Drilling Rate feet per hour, Bulk Density of Cuttings (Using Mud Balance), Drill String Design (Limitations), Ton-Mile (TM) Calculations, Cementing Calculations, Weighted Cement Calculations, Calculations for the Number of Sacks of Cement Required, Calculations for the Number of Feet to Be Cemented, Setting a Balanced Cement Plug, Increase Oil/Water Ratio,
Decrease Oil/Water Ratio, Hydraulicing Casing
Depth of a Washout, Lost Returns — Loss of Overbalance, Stuck Pipe Calculations, Calculations Required for Spotting Pills, Pressure Required to Break Circulation, Tags : United States, Kuwait, India, Canada, Indonesia, Russia, France, Oil Company, Petroleum, Oil & Gas, Mud, Cement
Annular Volume, Pipe Volume, Hyrdostatic Pressure, ECD, Volume Conversion, Drill String Volume in bbls
Annular Volume in bbls, Strokes – Surface to Bit,Strokes – Bit to surface or “Bottoms Up”,Total Stokes – Kelly to Shaker, Slug Calculation – Length of DRY Pipe, Slug Weight Calculation – Length of DRY Pipe, Accumulator Capacity — Usable Volume Per Bottle, Control Drilling – Maximum Drilling Rate feet per hour, Bulk Density of Cuttings (Using Mud Balance), Drill String Design (Limitations), Ton-Mile (TM) Calculations, Cementing Calculations, Weighted Cement Calculations, Calculations for the Number of Sacks of Cement Required, Calculations for the Number of Feet to Be Cemented, Setting a Balanced Cement Plug, Increase Oil/Water Ratio,
Decrease Oil/Water Ratio, Hydraulicing Casing
Depth of a Washout, Lost Returns — Loss of Overbalance, Stuck Pipe Calculations, Calculations Required for Spotting Pills, Pressure Required to Break Circulation, Tags : United States, Kuwait, India, Canada, Indonesia, Russia, France, Oil Company, Petroleum, Oil & Gas, Mud, Cement
Show More
最新バージョン 1.2 の更新情報
Last updated on 2020年10月26日
旧バージョン
updated formulas
Show More
Version History
1.2
2020年10月26日
updated formulas
1.1
2014年05月15日
Added Oifield calculations
1.0
2014年05月01日
OilField HandyCalc FAQ
ここをクリック!地理的に制限されているアプリのダウンロード方法をご参考ください。
次のリストをチェックして、OilField HandyCalcの最低システム要件をご確認ください。
iPhone
iOS 8.0以降が必要です。
iPad
iPadOS 8.0以降が必要です。
iPod touch
iOS 8.0以降が必要です。
OilField HandyCalcは次の言語がサポートされています。 英語