Material Procurement Tracker
Free
1.0for iPhone
Age Rating
Material Procurement Tracker 스크린 샷
About Material Procurement Tracker
Ties procurement items for all project materials to your project’s baseline schedule and schedule updates of your choosing.
Allows you to break up procurement sequentially, exactly how a job will be delivered and built.
For each specific project material float is tracked and color-coordinated. For example, negative values to +10 days are red, +10 to 50 days are yellow, +50 plus days are green Know exactly when each material is expected per scheduled date and expected per reality as well as when the float on that material becomes critical. Items with yellow and red float colors deserve discussion, expediting and mitigation on behalf of one or multiple parties.
Once construction documents are issued and prime contract is executed, General Contractors can start to zero in on the procurement of materials.
• Hold weekly procurement tracking meetings with subcontractors. Subcontractors can have a designated time to call in each week. Share on a Screen for all to see via Go-to Meeting.
• Share up on a screen in the weekly OAC Meeting or separate procurement meeting with Owner and design team. Show the client and design team in real time when decisions need to be made by.
• Write the use, cost and updating into every subcontract a general contractor executes on a project. Ultimately, each subcontractor will be responsible for tracking their procurement in one central location. This information will be reviewed weekly with general contractor for accuracy and to address potential/real concerns.
Benefits:
1. Multiple users allowed simultaneously with live updating.
3. Updates and usage are tracked (by user with date and time).
4. No limit to number of users on each tracker.
5. Formulas are preset and locked.
Allows you to break up procurement sequentially, exactly how a job will be delivered and built.
For each specific project material float is tracked and color-coordinated. For example, negative values to +10 days are red, +10 to 50 days are yellow, +50 plus days are green Know exactly when each material is expected per scheduled date and expected per reality as well as when the float on that material becomes critical. Items with yellow and red float colors deserve discussion, expediting and mitigation on behalf of one or multiple parties.
Once construction documents are issued and prime contract is executed, General Contractors can start to zero in on the procurement of materials.
• Hold weekly procurement tracking meetings with subcontractors. Subcontractors can have a designated time to call in each week. Share on a Screen for all to see via Go-to Meeting.
• Share up on a screen in the weekly OAC Meeting or separate procurement meeting with Owner and design team. Show the client and design team in real time when decisions need to be made by.
• Write the use, cost and updating into every subcontract a general contractor executes on a project. Ultimately, each subcontractor will be responsible for tracking their procurement in one central location. This information will be reviewed weekly with general contractor for accuracy and to address potential/real concerns.
Benefits:
1. Multiple users allowed simultaneously with live updating.
3. Updates and usage are tracked (by user with date and time).
4. No limit to number of users on each tracker.
5. Formulas are preset and locked.
Show More
최신 버전 1.0의 새로운 기능
Last updated on Feb 21, 2018
Version History
1.0
Feb 21, 2018
Material Procurement Tracker FAQ
제한된 국가 또는 지역에서 Material Procurement Tracker를 다운로드하는 방법을 알아보려면 여기를 클릭하십시오.
Material Procurement Tracker의 최소 요구 사항을 보려면 다음 목록을 확인하십시오.
iPhone
Material Procurement Tracker은 다음 언어를 지원합니다. Arabic, Azerbaijani, Catalan, Chinese, Czech, Danish, Dutch, English, Finnish, French, German, Greek, Hebrew, Hungarian, Indonesian, Italian, Japanese, Korean, Norwegian Bokmål, Norwegian Nynorsk, Polish, Portuguese, Romanian, Russian, Slovak, Spanish, Swedish, Turkish, Ukrainian, Vietnamese