Scraper Calculator
$1.99
1.2for iPhone
Age Rating
Scraper Calculator 스크린 샷
About Scraper Calculator
Calculate the cost and production rate of earthworks using a scraper fleet.
Compatible for iOS 7 and iOS 8. Calculator can use both imperial and metric units. Currency and number format are location specific.
Use this pocket estimating tool to:
• Calculate production rates and costs based on site conditions and the type of scraper used.
• Calculate the number of push dozers required (if applicable) and pushes per dozer per hour.
• Identify the most cost effective number of scrapers in your fleet using the +- button on the results page.
• Choose from the pre-loaded scrapers in the picker wheel or use 'Custom' to enter your own details.
Definition of terms:
• Haul Distance: The distance between the excavation site and the fill / spoil site.
• Average Speed: The average speed of the scrapers along the route between sites.
• Heaped Capacity: The maximum amount of material a scraper bowl can hold.
• Dump Time: The time taken for the scraper to empty its bowl at the destination site.
• Load efficiency: A factor that reduces the Heaped capacity based on site conditions, material bulking etc.
• Load Time: Time to load the scraper bowl.
• Productive Time: The average number of minutes within an hour that are productive during excavation.
• Reposition Dozer: The time taken for a dozer to return to its start position after completing a push (push loaded scrapers only).
Compatible for iOS 7 and iOS 8. Calculator can use both imperial and metric units. Currency and number format are location specific.
Use this pocket estimating tool to:
• Calculate production rates and costs based on site conditions and the type of scraper used.
• Calculate the number of push dozers required (if applicable) and pushes per dozer per hour.
• Identify the most cost effective number of scrapers in your fleet using the +- button on the results page.
• Choose from the pre-loaded scrapers in the picker wheel or use 'Custom' to enter your own details.
Definition of terms:
• Haul Distance: The distance between the excavation site and the fill / spoil site.
• Average Speed: The average speed of the scrapers along the route between sites.
• Heaped Capacity: The maximum amount of material a scraper bowl can hold.
• Dump Time: The time taken for the scraper to empty its bowl at the destination site.
• Load efficiency: A factor that reduces the Heaped capacity based on site conditions, material bulking etc.
• Load Time: Time to load the scraper bowl.
• Productive Time: The average number of minutes within an hour that are productive during excavation.
• Reposition Dozer: The time taken for a dozer to return to its start position after completing a push (push loaded scrapers only).
Show More
최신 버전 1.2의 새로운 기능
Last updated on Feb 23, 2016
오래된 버전
Updated for iOS 9
Show More
Version History
1.2
Nov 15, 2014
Updated for iOS 9
Scraper Calculator FAQ
제한된 국가 또는 지역에서 Scraper Calculator를 다운로드하는 방법을 알아보려면 여기를 클릭하십시오.
Scraper Calculator의 최소 요구 사항을 보려면 다음 목록을 확인하십시오.
iPhone
Scraper Calculator은 다음 언어를 지원합니다. English