Loadshedding app

Loadshedding app


Notifier & schedules for SA


免費

3.1.4for iPhone, iPad and more
3.9
4 Ratings
LCR Technologies (PTY) Ltd
Developer
57.3 MB
Size
2019年03月14日
Update Date
Utilities
Category
4+
Age Rating
Age Rating
4+
Apps in this category do not contain restricted content.
9+
Apps in this category may contain mild or occasional cartoon, fantasy or real-life violence, as well as occasional or mild adult, sexually suggestive or horrifying content and may not be suitable for children under 9 years of age.
12+
Apps in this category may contain occasional mild indecent language, frequent or intense cartoon or real-life violence, minor or occasional adult or sexually suggestive material, and simulated gambling, and may be for children under 12 years of age.
17+
You must be at least 17 years old to access this App.
Apps in this category may contain frequent and intense offensive language; Frequent and intense cartoon, fantasy or realistic violence: frequent and intense adult, scary and sexually suggestive subjects: as well as sexual content, nudity, tobacco, alcohol and drugs, may not be suitable for children under 17 years of age.
Loadshedding app 螢幕截圖
Loadshedding app 海報Loadshedding app 海報Loadshedding app 海報
Loadshedding app 海報Loadshedding app 海報Loadshedding app 海報

About Loadshedding app

The Load Shedding App allows you to:
-Access load shedding schedules for multiple suburbs or areas
-Proactively anticipate when load shedding will take place
-Share schedules with friends and family
-Save to your calendar
-Equip you to plan your travel times
-Receive customized notifications for all the load shedding stages (1,2,3).

The Load Shedding App covers the schedules for the following suburbs/areas:
- Eskom
- City Power - Johannesburg
- City of Cape Town
- Durban - Ethekwini
- Ekurhuleni
- City of Tshwane
- Nelson Mandela Bay (PE)
- and many more

If you cannot find your area or suburb please let us know, and we'll make sure you get the info you need! Simply tap on the 'Request Suburb/Area to be added' from the search results, in the select suburb screeen or email us at addschedule@loadsheddingapp.co.za.

We love feedback and suggestions as much as we love, electricity at night. Please contact us at feedback@loadsheddingapp.co.za if you have any questions, comments or suggestions.
Show More

最新版本3.1.4更新日誌

Last updated on 2019年03月14日
歷史版本
- Improve suburb search and display of schedules
- Show empty search results if no suburb found
- Show time slot groupings of stage 2 to 4
Show More
Version History
3.1.4
2019年03月14日
- Improve suburb search and display of schedules
- Show empty search results if no suburb found
- Show time slot groupings of stage 2 to 4
3.1.2
2019年02月15日
Fixing error on searching for new suburb
3.1.1
2019年02月14日
- Enable push notifications
- Bug fixes
3.0.0
2018年12月08日
- We have rebuild the app from the ground up.
- New user interface.
- Improved functionality to provide better status updates.
- Improved updates to load shedding schedules.
2.1.0
2015年09月22日
Fixed an issue where app crashes, on new app update when app tries to import suburb data to new database structure.
2.0.0
2015年09月17日
We have re-written the app completely, to cater for new changes and future functionality. The new codebase will allow us to release updates and new features more quickly.

The update ensures that the Loadshedding app is compatible with iOS 9 and also fixes certain bugs.

We added new functionality to support new ad features, because we have to pay the bills, support the app and develop new functionality soon, while we still need to live with Load shedding.

Oh yes, and we have made deleting a suburb a little bit easier, for those that do not want to swipe to the left. We have included a delete button on the schedule screen.
1.7.4
2015年05月15日
The app will open and load faster. We also added some bug fixes.
1.7.0
2015年04月17日
- Auto refresh load shedding schedules for selected suburbs.
- Changed layout of list of suburbs and status screen.
- Add option to display additional information on status screen.
1.6.2
2015年02月25日
Bug fix:
Fixed the search for suburbs to make it faster and prevent the it from hanging.
Fixed the select suburb screen from crashing the app when you selected a new suburb.
1.5.0
2015年02月19日
The Load Shedding App covers more schedules including the following suburbs/areas:
- Eskom
- City Power - Johannesburg
- City of Cape Town
- Durban - Ethekwini
- Ekurhuleni
- City of Tshwane
- Nelson Mandela Bay (PE)
- and many more

You can now request a suburb/area to be added from inside the app, if you cannot find it.

You can even report a problem with a load shedding schedule for your area, if you believe it to be incorrect.

We have added the ability to add schedule dynamically from the server, so no need to wait for a new update.

Bug fixes:
1. The Delete Suburb issue is finally fixed. Now you can delete a suburb.
2. iPad sharing feature and send feedback via email are fixed.
1.0.0
2015年01月27日

Loadshedding app FAQ

點擊此處瞭解如何在受限國家或地區下載Loadshedding app。
以下為Loadshedding app的最低配置要求。
iPhone
須使用 iOS 9.0 或以上版本。
iPad
須使用 iPadOS 9.0 或以上版本。
iPod touch
須使用 iOS 9.0 或以上版本。
Loadshedding app支持英文

Loadshedding app相關應用

你可能還喜歡