1.1.18
2024-03-03
Project Office X Version 1.1.18 is a small update with some additional performance improvements we could make in the process.
1.1.12
2023-11-14
Project Office X 1.1.12 is a quick update to fix a couple details that went awry.
1.1.11
2023-11-02
Project Office X 1.1.11 is focused on app performance improvement and minor bug fixes:
• Significant productivity and performance improvement;
• Improved Critical path calculation;
• Fixed an issue with XML files importing;
• Fixed an issue with completion % depictions.
1.1.10
2023-10-20
Project Office X version 1.1.10 is a small bug-squashing and app-improving update to make sure the app runs smoothly.
1.1.9
2023-10-11
Meet the all-new Project Office X for iOS fully compatible with iOS 17! An app is completely rebuilt, with new features and a beautiful new design. Here’s what’s new inversion 1.1.9:
• BRAND-NEW DESIGN
Project Office X has been completely redesigned all the app elements.
• NEW INSPECTORS VIEW
Project Office X introduces new view of all inspectors windows.
• NEW EDITING ELEMENTS ON GANTT CHART
No more additional actions needed to edit tasks directly on Gantt chart. Simply choose the task and all editing elements will be available at once: drag the task to change its date, pull the edge to change duration and drag the connection arrow to add connects between tasks. For quick editing of completion percent, tap the task, long press on task and drag to set the value.
• GROUP VIEW ON GANTT CHART.
Added an option to show/hide group background on Gantt chart.
• RESOURCE CALENDARS
Each project automatically includes a base calendar with some general working hours and a resource calendar that specifies a unique schedule for a specific resource. Project calendars are used to schedule tasks, and if resources are assigned to tasks, resource calendars are used as well. For each resource you can create an individual resource calendars based on the settings in base calendar.
• TIME UNITS SETTINGS
In the new version of Project Office you can set time units (hours, days, or whatever works best for you) to display durations and amounts of effort.
• SMART DATE PARSING
Time units are designated with abbreviations defined for each localization. Entering duration or effort as “1 S” in French now results in 1 week instead of 1 second.
• GANTT CHART ZOOM
Long press the time line on the top of Gantt chart and get four options for zoom: day, week, month and year.
• AND MUCH MORE
To get more details, visit our website: https://www.dk-consulting.app/project-office
1.1.8
2023-10-10
Meet the all-new Project Office X for iOS fully compatible with iOS 17! An app is completely rebuilt, with new features and a beautiful new design. Here’s what’s new inversion 1.1.8:
• BRAND-NEW DESIGN
Project Office X has been completely redesigned all the app elements.
• NEW INSPECTORS VIEW
Project Office X introduces new view of all inspectors windows.
• NEW EDITING ELEMENTS ON GANTT CHART
No more additional actions needed to edit tasks directly on Gantt chart. Simply choose the task and all editing elements will be available at once: drag the task to change its date, pull the edge to change duration and drag the connection arrow to add connects between tasks. For quick editing of completion percent, tap the task, long press on task and drag to set the value.
• GROUP VIEW ON GANTT CHART.
Added an option to show/hide group background on Gantt chart.
• RESOURCE CALENDARS
Each project automatically includes a base calendar with some general working hours and a resource calendar that specifies a unique schedule for a specific resource. Project calendars are used to schedule tasks, and if resources are assigned to tasks, resource calendars are used as well. For each resource you can create an individual resource calendars based on the settings in base calendar.
• TIME UNITS SETTINGS
In the new version of Project Office you can set time units (hours, days, or whatever works best for you) to display durations and amounts of effort.
• SMART DATE PARSING
Time units are designated with abbreviations defined for each localization. Entering duration or effort as “1 S” in French now results in 1 week instead of 1 second.
• GANTT CHART ZOOM
Long press the time line on the top of Gantt chart and get four options for zoom: day, week, month and year.
• AND MUCH MORE
To get more details, visit our website: https://www.dk-consulting.app/project-office
1.1.7
2023-09-07
Project Office X 1.1.7 is a quick update to fix a couple details that went awry.